Bonn group delay solution L. Petrov ___________________________________________ New update. 60(5*) minutes clocks parameterization. 30(50*) minutes clocks parameterization. Cable calibration was disabled since it worsens fit by 2-8% NRAO20 clock reference station. New editing ELIM/MILE + UPSEI ELIM used 3 sigmas cutoff. UPWEI used 10 psec floor. Estimated positions of 0048-097 NGC1052 0402-362 0454-234 0537-441 1255-316 1313-333 1622-253 1741-038 1908-201 1921-293 1954-388 2052-474 2243-123 2255-282 Fit is 21.5 psec, being 2% of observations suppreseed. Performance of GGAO is bad. Clock of BR-VLBA, KP-VLBA, SC-VLBA have 300-500 psec peak to peak variation. Estimates of atmosphere in zenith direction have a saw-like pattern. Leonid Petrov 14-JUN-98 15:12:31