Final schedule of the LCS experiment v271b
Dear colleagues,
The final schedule of v271b is prepared.
The difference with respect to the v271a schedule
1) The newest version of AT20G catalogue, 2008.10.30 was used as
the basis catalogue for candidate selection.
2) The number of scans per source was increased from 3 to 4.
3) The minimum time between scans was set to 3 hours.
4) The maximum declination was raised to -45 deg.
5) On source time for tropospheric calibrators was reduced from 90 seconds
to 70 seconds. Actual scan length is ~10 seconds shorter.
94 target sources (66 sources scheduled in 4 scans, 28 in 3 scans) and
47 troposphere calibrator sources are scheduled.
Very strong calibrators (fringe finders):
Source Scan_No
1057-797 197, 219, 281
0637-752 135, 156, 220, 237
1718-649 259, 405
Leonid Petrov
24-NOV-2008 21:56:32